Double-Decker Exhibition Stands in Europe: Design and Build
A second level for meeting rooms and hospitality on the same footprint, engineered and approved for your venue, then built by local crews with one project manager.
For exhibitors at shows in France, Germany, Spain and Italy: structural calculation note, fire-rated materials and venue approval handled for you.

- 100% bespoke stand
- Detailed quote, no hidden costs
- Production supervised piece by piece
- Eco-responsible approach
What a double-decker stand gives you
Floor space is rented by the square metre of ground. A double-decker exhibition stand, also called a two-storey or mezzanine stand, adds usable area above it without renting more floor, and separates two jobs that compete on a busy stand: welcoming visitors and closing deals.
Private meeting rooms
Negotiations happen upstairs, away from aisle noise, while the ground floor stays open to visitors.
Hospitality and VIP area
A lounge or bar for key accounts, separate from the demo flow below.
Visibility from afar
The height of the structure makes your brand visible across the hall, within the venue height limit.
Same floor rental
More square metres to work with for the same ground area, which is often the scarcest resource at a large show.
How big should a double-decker exhibition stand be?
In practice a double-decker starts at 50 m² of ground, sometimes 36 m² depending on venue rules: below that, the staircase and circulation take too much of the usable space. Capacity upstairs follows a simple rule of thumb.
| Upper deck area | Approximate capacity | Typical use |
|---|---|---|
| 20 m² | About 10 people | One meeting room |
| 30 m² | About 15 people | Meeting room or comfortable VIP area |
| 50 m² | About 25 people | Two meeting rooms and a lounge |
Rule of thumb: about one person per 2 m² of upper deck. The load and evacuation rules approved by the venue always prevail.
What the venue requires before you build a second level
A double-decker is a structure that the organiser and the venue approve before build-up starts. We compile and file the technical file, and it is included in our service.
- Dimensioned drawings of both levels, with heights and stair positions
- A signed structural calculation note for the upper deck and its loads
- Fire ratings of the materials used on the stand
- Stairs and railings sized to the venue rules, with handrails and guardrails
- Safety equipment when rooms are enclosed under the upper deck, such as smoke detection
- The height limit of your hall and the rules next to neighbouring stands
Detailed quote · No commitment · A single point of contact
What one European venue actually asks for
Rules change from one venue to another. Here is what the ISE 2027 exhibitor manual sets for double-deck stands at Fira Barcelona Gran Via (2 to 5 February 2027).
| Rule | ISE 2027 requirement |
|---|---|
| Maximum height | 7 m in most halls, 6.50 m in hall 8.0 |
| Next to a neighbour | Walls above 4 m must be set back 1 m from the neighbouring stand |
| Rooms under the deck | Professional smoke detection, connected to the venue control centre |
| Stair handrail | Continuous handrail from two steps, at least 900 mm high; railings wherever there is a risk of falling |
| Upper deck certification | €636 up to 20 m², €823 for 21 to 50 m², €1,604 for 52 to 100 m² |
| Power upstairs | Ordered from the venue supplier so that cables reach the upper level |
Source: ISE 2027 exhibitor manual, read on 10 November 2026. Always check the current manual of your own show.
What drives the cost of a double-decker stand
Every double-decker is quoted on drawings, because the second level adds engineering and venue costs that a single-level stand does not have.
- The ground footprint and the upper deck area
- The load-bearing structure, sized by the structural calculation
- The venue's certification and inspection fees, such as the ISE fees above
- Stairs, railings and glass, and safety equipment for enclosed rooms below
- A longer build-up and dismantling: two to three days instead of one to two
- Reuse: a structure built for several shows spreads its cost across them
Send us your show and your footprint: you get a design proposal and a detailed quote, item by item.
Detailed quote · No commitment · A single point of contact
From footprint check to dismantling
Start at least three months before opening: the structural note and the venue approval add steps that a single-level stand does not need.
Footprint check
Venue rules, height limit, neighbours and deadlines of the exhibitor manual.
3D design
Both levels, stairs and circulation validated with you before engineering.
Structural note
Calculation note signed and technical file filed with the organiser.
Production
Structure and finishes made by selected partner workshops, supervised piece by piece.
Build and show
Two to three days of build-up with a dedicated site manager, then dismantling.
Other ways to get more from your stand
Custom trade show booth
Single-level custom booths for international exhibitors in Europe.
Custom booths →Modular booth
A reusable structure reconfigured for each footprint.
Modular booths →Turnkey package
Design, production, furniture, build and dismantling in one contract.
Turnkey stands →Stand rental guide
Rent, buy or reuse: the options compared for a trade show stand.
Read the guide →- One project manager from the footprint check to dismantling
- Structural calculation note and venue technical file included
- Production in selected partner workshops, supervised piece by piece
- A dedicated site manager during the extended build-up
- A demountable structure, stored between shows and re-approved for each venue
Frequently asked questions
About 50 m² of ground in practice, sometimes 36 m² depending on venue rules. Below that, the staircase and circulation take too much usable space to be worth it.
A full technical file: dimensioned drawings, a signed structural calculation note, fire ratings of the materials and stair sizing, plus safety equipment if rooms are enclosed under the deck. We compile it and file it with the organiser.
At least three months before opening, more for a large structure: the design, the structural calculation note and the venue approval must all be done before production starts, and some venues set an early deadline for complex structures.
A qualified structural engineer signs it, based on our drawings of both levels and the expected loads. We commission it, compile it with the rest of the technical file and follow the venue review until approval.
Yes: typically two to three days of build-up instead of one to two, with a dedicated site manager. We book the extended build slots with the venue as soon as the order is signed.
It is quoted on drawings: the price depends on the ground footprint, the upper deck area, the structure, the venue certification fees and the length of build-up. Send us your show and footprint for a detailed quote.
In Europe the structure is engineered and approved for each venue. We design and build double-deckers for one show or as a reusable structure, stored between shows and re-approved for each new venue, which lowers the cost per show for regular exhibitors.
Yes. The structure is demountable and adapts to other footprints. The calculation note simply has to be re-approved by each new venue, which we take care of.
Planning a double-decker for your next show?
Send us your show, your footprint and what you need upstairs. You get a design proposal and a detailed quote, built around the rules of your venue.
Detailed quote · No commitment · A single point of contact
Let's bring your next stand to life
Tell us about your show, your space and your goals. We come back to you with a first concept.